Industrial Concrete Pad

Farmingdale, NY

At a warehouse in Farmingdale NY Our electricians have started a job.  We have begun the prep work for a 180KW Kohler Generator install. Beginning with the PVC pipe underground and popping out under the generator. We built a form to frame-out the dimensions of the concrete pad. Following the Generators  placement to the building and to the generator spec sheet we place the PVC in the ideal situation for pulling wire and have a easy future connection. At Island Generator we believe in safety so we put up a temporary fence to secure the location for any unseen issues.